Beijing Exhibition Making Service Base was completed in Beijing Economic and Technical Development Zone in 2002, occupying an area of 15,000 m2. There are 90 people of professional technology of various work types such as woodworker, art designer and electrician.
The company also owns the professional equipment of metal processing and baking finish room etc., and logistics system for storage, transportation and maintenance.
Confirmation of CAD engineering drawings, factory lofting of engineering drawings, separating construction upon the drawings, pre-building of factory, packaging and transportation, construction on the spot, maintenance, and storage after exhibition closing.
Strict management will be implemented based on construction schedule.